EDUCATION PROJECTS

*Miami Dade Community College – Kendall Campus, Storage Renovations, Building L

Mechanical, Electrical and Plumbing design, construction documents and administration for renovations of the storage and housekeeping areas, 2,500 sf.

*Miami Dade Community College – North Campus, Office Renovations, Building 1000

Mechanical, Electrical and Plumbing design, construction documents and administration for office renovations, 1,500 sf.

University of Miami, Mahoney-Pearson Residence Hall, Fire Alarm Upgrade

Coral Gables, Florida

Design of cooling fan coil units to fire alarm control panel rooms. The fan coils are connected to existing chilled water system lines.

Florida International University, FIU Parking Garage Five/Retail/ Public Safety, University Park Campus

Miami, Florida

Mechanical, Plumbing and Fire Protection design, construction documents for a multilevel open parking garage for approximately 1,441 cars and garage support space. Included in the project 25,000 sf of retail space, classrooms, and food service retail spaces, and 9,000 sf of office space for the FIU Public Safety Department. Provisions for future expansion of Public Safety were also included. Included emergency ventilation for two enclosed air cooled chillers to avoid re-circulation.

University of Miami, Wellness Center Addition

Coral Gables, Florida

Mechanical, Plumbing and Fire Protection design, construction documents and administration for a 2-story, 18,000 sf center addition includes a chilled water system with variable air volume for exercise rooms and extension of existing smoke evacuation system to common area of the building addition was also included.

University of Miami, Founders Hall Renovations

Coral Gables, Florida

Mechanical and Plumbing design, construction documents and administration, for the renovation of a single story, 7,000 sf building included a chilled water system with air handler units.

Kelloggs Miami Campus, Northwestern University Expansion

Coral Gables, Florida

Mechanical, Plumbing and Fire Protection design, construction documents and administration, for a 5,000 sf space for a school of management. An air conditioning system provided from an existing central chilled water unit, and additional fan coils in classrooms was provided.

Miami-Dade County Public Schools, William Turner Technical School, Air Conditioning Replacement

Miami, Florida

Mechanical and Plumbing design, construction documents, for a replacement of 37 central chilled water air handler units in the existing school. Project included variable air volume and constant volume systems, direct digital controls to replace existing pneumatic controls and the replacement of around 200 variable air volume boxes throughout the school.

Miami-Dade County Public Schools, Miami Sunset Senior High School HVAC Renovations

Miami, Florida

Mechanical and Plumbing design, construction documents and administration for the replacement of a 300-ton water cooled chiller, air cooled chillers, cooling tower and system components for Miami-Dade County Schools.

Florida International University, Pharmed Arena Cooling Tower Replacement

Miami, Florida

Mechanical design, construction documents and administration for the replacement of a (2) cell, 1200 GPM cooling tower connected to a chiller plant. Change over motorized valves and controls to have variable speed fans was provided.

University of Miami, School of Business AHU Replacement

Coral Gables, Florida

Design and construction documents for the replacement of four central chilled water multi zone air handling units and associated controls connected to existing chilled water system for the 4th and 5th Floors.

University of Miami, Ferre Building AHU Replacement

Coral Gables, Florida

Mechanical design, construction documents and administration for the replacement of central multi zone air handling units and associated controls connected to existing chilled water system on the 2nd Floor.

University of Miami, Clinical Laboratory

Coral Gables, Florida

Feasibility study for a 2-story modular laboratory. The project included the study of the mechanical, plumbing and fire protection systems.

University of Miami, Ashe Administration Building Renovations

Coral Gables, Florida

Mechanical Engineer for the design and development of construction documents for the renovation of mechanical and plumbing systems for a 35,000 sf office building. The HVAC system included a chilled water system, with air handler units.

University of Miami, Papanicolaou Lab Study

Coral Gables, Florida

Preliminary study of an existing laboratory 5-story building to be remodeled, 50,000 sqft. It included survey, analysis and recommendations for the HVAC, Plumbing and Fire Protection systems for the new proposed remodeling.

University of Miami, Rosensteil Trailers

Coral Gables, Florida

Assisting during the design and construction of a 2-story laboratory, 22,000 sqft . It included pre-design and narrative, design review, recommendations, permitting and construction.

University of Miami, Gautier Building Survey and Study

Coral Gables, Florida

Preliminary study of an existing laboratory 7-story building to be remodeled, 70,000 sqft. It included survey, analysis and recommendations for the HVAC, Plumbing and Fire Protection systems for the new proposed remodeling.