Commercial

COMMERCIAL PROJECTS

East Coast Building

Miami, FL

Project is a new 9-story office Self Storage mixed use high rise building.

It includes a ground level with open parking, office, restaurant space, utility rooms; levels 2-8 for self storage, 12,000 sqft each; level 9 for a rooftop restaurant and outdoor terrace. MEPFP design, including a smoke control, emergency generator, fire pump.

Wings Hollywood

Hollywood, FL

It consisted of providing MEPFP design and plans for the remodeling and Addition of an existing retail building, estimated area 19,281 sqft.

Building divided in two tenant spaces, one finish space for Wings (9,533sqft), one shell restaurant space (7,394 sqft gnd and 2,354 sqft future mezzanine, 9,748 sqft total) for future use and common corridors.

*Thyssen Building Build Out

Miami Beach, FL

Mechanical, Electrical/FA, Plumbing and Fire Protection design, construction documents and administration for a 4-Story build-out shell office building, 42,000 sf office area, 15,000 sf common area.

*Pestana Hotel and Resort

Miami Beach, Florida

Mechanical, Electrical/FA, Plumbing and Fire Protection design, construction documents for the design and development of a 94-room hotel conversion historical building including retail/restaurant on the first and second level and fourteen levels of parking.

Y & Y Building

Doral, FL

Mechanical, Electrical and Plumbing design, construction documents and administration for a Two Story Office Building, 60,000 sqft.

Le June Office Building

Coral Gables, Florida

Mechanical design, construction documents and administration for a 15-story office building. Project included a chilled water system, with a total of 800 tons of cooling, smoke evacuation system.

Four Midtown, Mixed Occupancy Building

Miami, Florida

Mechanical design, construction documents and administration for a 33-story multifamily/commercial building. 1,100 tons of cooling.

Metropolitan One- MET1, Multi-Use Building

South Miami, Florida

Mechanical design, construction documents and administration for a 40-story building including retail/restaurant on the first and second level and fourteen levels of parking. 1,800 tons of cooling.

*Blue Moon at The Grove

Miami, FL

Mechanical, Electrical/FA, and Plumbing design, construction documents and administration for a multifamily building, 5-story, 40 apartments.

“W” South Beach Condo/Hotel

Miami Beach, FL.

Mechanical design, construction documents and administration for a 21-story building. Project included a chilled water system, with a total of 1,400 tons of cooling, 511 units

* Vida Abundante Church

Mechanical, Electrical/FA, Plumbing, and Fire Protection design. Fire Alarm system with a voice evacuation notification for a new tenant religious church, included offices, classrooms and sanctuary, 17,000 sqft.

*The Champs Daycare

Miami, FL

Mechanical, Electrical/FA, Plumbing and Fire Protection design, construction documents and administration for a build-out of an existing tenant space for a Day Care Facility, 4,000 sf, second floor of a existing high rise building.

*Piazza Daycare

Coral Gables, FL

Mechanical, Electrical, Plumbing design, construction documents and administration for a build-out of an existing stand alone building for a Day Care Facility, 5,500 sf.

*Santillane Building

Coral Gables, FL

Mechanical, Electrical/FA, and Plumbing design, construction documents, for a multifamily building, 7-story, 28 apartment building.

*West Brickell Building

Miami, FL

Mechanical, Electrical/FA, Plumbing, and Fire Protection design, construction documents, for a multifamily building, 3-story, 30 apartment building.

* Life Church

Mechanical, Electrical/FA, Plumbing, and Fire Protection design. Fire Alarm system with a voice evacuation notification for a new tenant religious church, included offices, classrooms and sanctuary, 8,000 sqft.

Barclays Financial Center

Miami, FL.

Electrical design, construction documents and administration for a high rise 40-story corporate building.

Westfield Sarasota Shopping Mall, Addition and Remodeling

Sarasota, Florida

Mechanical design, construction documents and administration for a complete renovation of this existing mall and addition of a food court and several utility areas.

Incredible Universe Warehouse, Renovations & Office Build Out

Doral, Florida

Mechanical, Plumbing and Fire Protection design, construction documents, for the remodel of an existing 100,000 sf office/warehouse building. Project included a showroom, offices, receiving, and break room areas.

South Miami Retail and Parking Garage

South Miami, Florida

Mechanical and Plumbing design, construction documents and administration for a 5-story building; retail/restaurant on the ground floor, 34,000 sf three additional stories of covered parking and one story of open parking at 34,000 sf.

The Foundry, New Self Storage Facility

Ft. Lauderdale, Florida

Mechanical and Plumbing design, construction documents and administration for a new 6-story self storage facility, ground floor with lobby, retail areas and loading dock.

Museo Vault, New Self Storage Facility

Miami, Florida

Mechanical and Plumbing design, construction documents and administration for a new 5-story art self storage facility, ground floor with lobby, retail areas and loading dock. Building was provided with humidity control.

*Projects developed with P.J.V. Engineering Inc. otherwise associated with other firms.